Showing posts with label Framing. Show all posts
Showing posts with label Framing. Show all posts

Saturday, November 13, 2010

Framing 90%: The Sequel



Driving up to the Garfield Bay house.

Framing 90% view from the road

Framing 90%

Framing 90% from the front

Framing 90% completed from the entrance

Framing 90% finished from the rear

Sunday, October 31, 2010

The second floor emerges.

Stair tower side of house

Front of house gable walls

Framing with tower walls

Framing with gable walls





Sunday, October 24, 2010

First floor framing is mostly complete.

Look at the beautiful sunlight, coming through the trees from the lake. Our little place is really coming along. Next, the second floor will be framed. And, we're talking cedar siding with our builder. He got a deal for us...

It's really happening. Framing views.

We have foundation and the first floor framing.

Monday, October 18, 2010

Framing today! sez our builder

Framing started today. This is the view looking north.











This view is looking east.